The existing Groundsman’s hut building falls within the footprint of the new Changing room block (project Phase 1) and so it is being carefully taken down (helped by Stuart Birch with his sledge hammer).
We have formed a water proof enclosure to protect the floodlight controls which will remain during phase 1.
The building will be re-erected later to provide much needed storage – location to be decided
In the main clubhouse, again as part of the enabling works, we have already demolished the Physio room and storage cupboards and re-sited these, along with the cleaning store to Changing room 8.
A new door has been cut connecting the rear corridor near changing room 8 to changing rooms 2 and 3, this will be the new fire escape as the existing rear fire escape is removed in phase 1.
We have also started today to remove the floor to the rear corner of the building (old Physio room) as this forms the boiler plant room for phase 1.
We hope to publish these updates on a regular basis
We are also building an archive Photo album collection which you can view by visiting the VISITING THE WEB SITE TO VIEW THE REGULAR UPDATES IN THE ALBUMS
KEEP VIEWING THE CLUBS OFFICIAL WEB SITE
www.newarkrugby.com
DO YOU RECEIVE CLUB NEWS?
ARE YOU A MEMBER OF THE CLUBS WEB SITE?
TO JOIN CLICK THE FOLLOWING LINK
http://alturl.com/kj9th