53/110
06-06-2018 35 cubic metres of Concrete to lay on the floor beams to form the floor slab to the new Club room, bar and kitchen.
06-06-2018 35 cubic metres of Concrete to lay on the floor beams to form the floor slab to the new Club room, bar and kitchen.